Skip to content

Perla Engineering · 2026

Daily Site Reporting System

Standardizing how a construction site reports progress, one day at a time.

This write-up uses a recreated, redacted description rather than the real internal documents — some details are withheld to protect confidential company information.

01 — Context

Engineers across several active project sites were reporting daily progress informally, with no consistent structure for what got captured or how it reached management.

02 — The Problem

Daily activity on site wasn't being captured in a form that could reliably feed weekly or monthly reporting — so reporting further up the chain depended on reconstructing what happened after the fact.

03 — My Role

Operations at Perla Engineering

04 — The Approach

Designed a short daily report — work completed, plan for tomorrow, workers on site, materials needed, issues — paired with a simple compliance rule: at least one site photo shared in the project's WhatsApp group as visual confirmation.

05 — The System

A daily reporting workflow built on tools the site teams already used, with a defined review path before a report becomes part of the official record.

06 — How It Works

An engineer submits the daily report and it's logged automatically. For higher-stakes reporting contexts, submissions pass through a technical review step before approval, and only approved reports become eligible for management-level reporting.

07 — Tools

  • Google Forms
  • Google Sheets
  • WhatsApp
  • Google Drive

08 — Implementation

In active use across multiple project sites, with weeks of real submissions from site engineers. A more structured version of the same workflow — including a formal technical-review and approval chain — has also been designed as a reference build for a future, more integrated reporting system.

09 — Current Evidence

No formal adoption or time-saved metric exists yet — that evidence is still in development.

The reference build for the more integrated version of this system includes real project data from a client engagement that can’t be shown publicly — this write-up describes the workflow without exposing that data.